
WALBURG WBS1099 Brake Shoe Rear Renault Kangoo (Kc0 / 1) 1.4i with Lever 203,2X39 mm 1998-2008 / Kangoo 1.5 dCi-1998-2008 / Kangoo 1.9 D-1998-2008
We ship to the US and 26 other countries
- Standard shipping: $9.99 below $49
- Need a part by a certain date? Contact us before ordering.
- Free US shipping on orders $49+
In stock, ready to ship
Contact us to confirm delivery timing for your part.
Fitment
Listed for Kangoo · 1998–2008
Check this part against your vehicle
Choose a make to search. Year and model are optional. Year works without a model.
Product details
The WALBURG WBS1099 rear brake shoe is for Renault Kangoo (Kc0 / 1) 1.4i with Lever 203,2X39 mm 1998-2008 / Kangoo 1.5 dCi-1998-2008 / Kangoo 1.9 D-1998-2008. It comes with an arm, has an inner brake drum diameter of 203 mm and a width of 39 mm, and is marked E1 90R-011043/068. Confirm fitment by part number before ordering.
Technical Specifications:
- Inner Brake Drum Diameter [mm]: 203 mm
- Width [mm]: 39 mm
- Additional Product/Auxiliary Description: Arm with
- Control Marking: E1 90R-011043/068
- Brand: WALBURG
- Part Number: WBS1099
- Category: Brake Cables & Hardware
- Fits: Renault
Checking fitment
Match the part number above against the part you are replacing, or check the models and engines named on this page against your vehicle. If the number matches, the part matches.
Shipping
Standard US shipping is $9.99 below $49 and free on orders of $49 or more. Contact us before ordering if you need a part by a particular date.
Returns & warranty
30 days to return an unused part in its original packaging. Manufacturer warranty of 12 months against defects.




