
WALBURG WBS1091 Parking Brake Shoe Opel Vectra B 1.6i 160X25 mm 1995-2003 / Astra G (F69) 1.6 16V 1998-2005 / Vectra B 1.8i 16V 1995-2003 / Vectra A 1.6 1988-1995 / Vectra B 2.0i 1995-2003 / V
Shipping within the United States
- Standard shipping: $9.99 below $49
- Need a part by a certain date? Contact us before ordering.
- Free US shipping on orders $49+
In stock, ready to ship
Contact us to confirm delivery timing for your part.
Fitment
Listed for Astra, Vectra · 1988–2005
Check this part against your vehicle
Choose a make to search. Year and model are optional. Year works without a model.
Product details
Technical Specifications:
- Brake System: ATE (Teves)
- Inner Brake Drum Diameter [mm]: 160 mm
- Width [mm]: 25 mm
- Brand: WALBURG
- Part Number: WBS1091
- Category: Brake Cables & Hardware
- Fits: Opel
Checking fitment
Match the part number above against the part you are replacing, or check the models and engines named on this page against your vehicle. If the number matches, the part matches.
Shipping
Standard US shipping is $9.99 below $49 and free on orders of $49 or more. Contact us before ordering if you need a part by a particular date.
Returns & warranty
30 days to return an unused part in its original packaging. Manufacturer warranty of 12 months against defects.




