WALBURG Part no. WBS1044

WALBURG WBS1044 Brake Shoe Rear Fiat Egea 1.3 Mjt with Lever 227,4X42 mm 2015-/ Fiat 500L 1.6 Mjt 2012-/ Fiat 500L 1.3 Mjt 2012-/ Fiat 500L 0.9 2012-/ Fiat 500L 1.4 2012

$90.95 Free US shipping on orders $49+

Shipping within the United States

  • Standard shipping: $9.99 below $49
  • Need a part by a certain date? Contact us before ordering.
  • Free US shipping on orders $49+
Shipping policy

In stock, ready to ship

Contact us to confirm delivery timing for your part.

Secure checkout
  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Fitment

Listed for 500L, Egea · 2012–2015

Check this part against your vehicle

Choose a make to search. Year and model are optional. Year works without a model.

Fitment stated by the supplier
12-month warranty
30-day returns
Parts help by email
Product details

Technical Specifications:

  • Inner Brake Drum Diameter [mm]: 229 mm
  • Width [mm]: 43 mm
  • Additional Product/Auxiliary Description: Arm with
  • Brake System: AP Lockheed
  • Brand: WALBURG
  • Part Number: WBS1044
  • Category: Brake Cables & Hardware
  • Fits: Fiat
Checking fitment

Match the part number above against the part you are replacing, or check the models and engines named on this page against your vehicle. If the number matches, the part matches.

Ask us to confirm this part

Shipping

Standard US shipping is $9.99 below $49 and free on orders of $49 or more. Contact us before ordering if you need a part by a particular date.

Returns & warranty

30 days to return an unused part in its original packaging. Manufacturer warranty of 12 months against defects.