WALBURG Part no. WBS1028

WALBURG WBS1028 Brake Shoe Rear Fiat Linea (323) 1.3 Mjt with Lever 228X40 mm 2007-/ Grande Punto 1.3 Mjt 2005-2012 / Corsa D 1.3 CDTi 2006-2014 / Corsa E 1.4 2014

$99.95 Free US shipping on orders $49+

We ship to the US and 26 other countries

  • Standard shipping: $9.99 below $49
  • Need a part by a certain date? Contact us before ordering.
  • Free US shipping on orders $49+
Shipping policy

In stock, ready to ship

Contact us to confirm delivery timing for your part.

Secure checkout
  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Fitment

Listed for 323, Corsa, Grande Punto, Linea, Punto · 2005–2014

Check this part against your vehicle

Choose a make to search. Year and model are optional. Year works without a model.

Fitment stated by the supplier
12-month warranty
30-day returns
Parts help by email
Product details

The WALBURG WBS1028 rear brake shoe with lever, 228X40 mm, is for Fiat Linea (323) 1.3 Mjt 2007-, Grande Punto 1.3 Mjt 2005-2012, Corsa D 1.3 CDTi 2006-2014 and Corsa E 1.4 2014. It has Inner Brake Drum Diameter [mm] 229 mm, Width [mm] 42 mm, Hole Diameter [mm] 19 mm and comes with wheel brake cylinder. Confirm fitment by part number before ordering.

Technical Specifications:

  • Inner Brake Drum Diameter [mm]: 229 mm
  • Width [mm]: 42 mm
  • Additional Product/Auxiliary Description: Wheel Brake Cylinder with
  • Hole Diameter [mm]: 19 mm
  • Brand: WALBURG
  • Part Number: WBS1028
  • Category: Brake Cables & Hardware
  • Fits: Fiat
Checking fitment

Match the part number above against the part you are replacing, or check the models and engines named on this page against your vehicle. If the number matches, the part matches.

Ask us to confirm this part

Shipping

Standard US shipping is $9.99 below $49 and free on orders of $49 or more. Contact us before ordering if you need a part by a particular date.

Returns & warranty

30 days to return an unused part in its original packaging. Manufacturer warranty of 12 months against defects.