WALBURG Part no. WBS1004

WALBURG WBS1004 Parking Brake Shoe Chevrolet Captiva (C100,C140) 2.0 D 188,6X26 mm 2006-/ Captiva (C140) 2.0 D 2012-2014 / Opel Antara 2.0 CDTi 2007

$79.95 Free US shipping on orders $49+

We ship to the US and 26 other countries

  • Standard shipping: $9.99 below $49
  • Need a part by a certain date? Contact us before ordering.
  • Free US shipping on orders $49+
Shipping policy

Sold out

Secure checkout
  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Fitment

Listed for Antara, Captiva · 2006–2014

Check this part against your vehicle

Choose a make to search. Year and model are optional. Year works without a model.

Fitment stated by the supplier
12-month warranty
30-day returns
Parts help by email
Product details

The WALBURG WBS1004 parking brake shoe, 188,6X26 mm, is for Chevrolet Captiva (C100,C140) 2.0 D 2006-, Captiva (C140) 2.0 D 2012-2014 and Opel Antara 2.0 CDTi 2007. It has Control Marking ECE-R90, Width 26 mm and Inner Brake Drum Diameter 180 mm. Confirm fitment by part number before ordering.

Technical Specifications:

  • Control Marking: ECE-R90
  • Width [mm]: 26 mm
  • Inner Brake Drum Diameter [mm]: 180 mm
  • Brand: WALBURG
  • Part Number: WBS1004
  • Category: Brake Cables & Hardware
  • Fits: Chevrolet, Opel
Checking fitment

Match the part number above against the part you are replacing, or check the models and engines named on this page against your vehicle. If the number matches, the part matches.

Ask us to confirm this part

Shipping

Standard US shipping is $9.99 below $49 and free on orders of $49 or more. Contact us before ordering if you need a part by a particular date.

Returns & warranty

30 days to return an unused part in its original packaging. Manufacturer warranty of 12 months against defects.