Brembo Part no. P11017

Brembo P11017 Brake Pads Enhanced Stopping Power Compatible with Chrysler 300C

$148.95 Free US shipping on orders $49+

We ship to the US and 26 other countries

  • Standard shipping: $9.99 below $49
  • Need a part by a certain date? Contact us before ordering.
  • Free US shipping on orders $49+
Shipping policy

In stock, ready to ship

Contact us to confirm delivery timing for your part.

Secure checkout
  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Fitment

Listed for 300C

Check this part against your vehicle

Choose a make to search. Year and model are optional. Year works without a model.

Fitment stated by the supplier
12-month warranty
30-day returns
Parts help by email
Product details

Upgrade your braking system with the Brembo P11017 Brake Pads, specifically designed for the Chrysler 300C (2004 model). These front brake pads provide superior stopping power and are perfect for car owners who prioritize performance and safety.

Key Benefits:

  • Optimized for Chrysler 300C: Ensures a perfect fit for your vehicle.
  • Superior Performance: Experience enhanced braking efficiency and responsiveness.
  • Durable Materials: Built to withstand high temperatures and provide long-lasting performance.

Technical Specifications:

  • Width: 7.2 inches (183 mm)
  • Thickness: 0.71 inches (18 mm)
  • Height: 1.83 inches (46.5 mm)
  • Wear Indicator: Equipped with an audible wear warning system.
  • Brake System: Compatible with Bosch brake systems.
  • Number of Wear Indicators: 8 per axle.
  • WVA Number: 24164.

Installation & Care Instructions:

Professional installation is recommended for optimal performance. Ensure to check your vehicle specifications before installation. For maintenance, regularly inspect brake pads for wear and replace as necessary to ensure safety on the road.

Fitment placement: Front

Checking fitment

Match the part number above against the part you are replacing, or check the models and engines named on this page against your vehicle. If the number matches, the part matches.

Ask us to confirm this part

Shipping

Standard US shipping is $9.99 below $49 and free on orders of $49 or more. Contact us before ordering if you need a part by a particular date.

Returns & warranty

30 days to return an unused part in its original packaging. Manufacturer warranty of 12 months against defects.

More from Brembo

View all (965) →
BremboBrembo 09.8303.75 Brake Disc Front Max Peugeot | Set of 2
$221.95 Out of stock